Map
Create a floor map
Create a new 3D floor map from an image or PDF using AI drawing, or draw directly in the 3D designer. Recommended for new maps.
Use Map when creating any new floor map. Before you begin, make sure your buildings and floors already exist in Directory.
Select a floor and choose how to start
Open Map, switch to the New map view, and select your building and floor. Then open that floor’s editor. Switching the map view changes which maps users see across your entire account. It is not a separate switch for each floor.
On a floor that does not have a 3D map yet, choose how to start:
- AI drawing. Upload a floor plan image or PDF to generate a draft map. This option requires available AI map quota. Always check the generated scale, doors, room boundaries, and resource assignments before publishing.
- Start from empty. Draw the floor map manually in the 3D designer.
If the floor already has a Classic map (legacy), see Move from Classic map (legacy) to Map before using From classic.
Draw and save drafts in the 3D designer
The 3D designer edits the floor map directly in 3D. Switching to the Top-down camera shows a flat overhead view of the same map. Insert walls, rooms, doors, and furniture, then select any object to adjust its size or position. For editing details, see Edit a 3D floor map.
Your changes save automatically as a draft. Wait until the header shows Saved, then publish your updates using Review and update. If a floor has no published 3D map yet, users may see its saved draft as soon as the New map view is enabled, so do not assume your first saved draft is private.
Generate a map with AI drawing
Upload a clear, straight floor plan showing a single floor. If you upload a PDF, put the target floor on the first page. Confirm the map area to crop out unrelated margins, then check the proposed Plan size in metres. Verify Plan size against a known real-world length even when Offision reads a scale bar or dimension labels. Check Estimated sizes carefully and adjust the dimensions before continuing.
Each AI drawing run uses your account’s remaining AI-map allowance, shown beside the button:
- When No AI maps left appears, you can select Contact sales or choose Start from empty to draw manually.
- Allowances vary by account, and retries are not automatically free.
- Stopping a reading after it starts still consumes one AI map, as noted in the Stop confirmation dialog.
After generation finishes, inspect the result before selecting Use this map or opening the designer:
- Link bookable resources. A generated drawing creates map shapes only, not bookable resources. Link your rooms and desks in Assign rooms, desks, and other resources on a 3D map.
- Review flagged items and paths. Step through each item marked to check, inspect doors and walkable areas, and test walking directions after updating.
- Replace unreadable files. If Offision cannot read the file, upload a clearer floor plan or select Start from empty. Do not retry the same unreadable sheet repeatedly and use up your quota.
Track AI drawing progress and retry failed previews
The AI drawing progress screen shows separate stages for reading the plan, saving the draft, and preparing the preview:
- No time estimate shown. A missing time estimate does not mean the drawing has stalled.
- Reconnecting. If the connection drops, wait for the status to recover before starting another AI reading.
- AI drawing preview failed. If the drawing was saved (
Draft saved; preview unavailable.) and only the preview failed, retry the saved map preview. Retrying reuses the saved drawing instead of reading the floor plan again.

The 3D designer showing rooms, walls, furniture, and toolbar controls for editing a floor map.

